Chapel Allerton

Chapel Allerton, Leeds

4.62 kWp and 10 kWh of Battery Storage

The in-roof solar installed across 3 aspects of the roof along with a battery system has allowed this couple to only import 7% of their energy from the grid during May 2024.

ACT worked with our teams to provide a full re-roof with integrated solar panels to help the household reduce their energy bills.

Previous
Previous

Apperley Bridge

Next
Next

Alwoodley